SU-DHAM
Gallery
View Project
Putty Work
Electrical Conduit Work
Grill Fixing
Floor Tiles
Terrace Work
Staircase Masonry Work
Ventilator Putty Work
Plumbing Work
Balcony Tile Work
Kitchen Tile Work
Building Photo
Basement lobby masonry work
Front Gate work in progress
Compound Wall
Latrine Tile Work
Balcony Painting
Security room Masonry work
Compound wall Plastering
Bed Concrete
Lift door fixed
Painting Work
Terrace Masonry work
Lift Pit Cleaning
Outside putty work
Pop removed
External Painting
F.D.Frame fixing
Cleaning of 203
Main door fixing work
Beeding work
Front Beam Concrete work
WC Fixing
Main Cable for TC
Plumbing Fittings work
shutter fixing work
Soil spreading and compaction
Structural Glazing
Railing glass fixed
Section C lading fixed
Terrace Epoxy work
Ramp Interlock laying
stair case lighting work
Ramp Area interlock fixing
door Accessories work
Basement Camera Fixing
door no fixing
Building Completed
Inauguration lightings
Inauguration
×